Hire BKF Engineers to study replacement options for failing Keller Beach sewer line

Keller Beach SewerContractsPublic Works

$650,000 (up to $780,000 total)

Resolution 111-25

In Plain English

The city's main sewer line serving Keller Beach is deteriorating and needs urgent attention after environmental groups raised concerns about potential overflows. A previous engineering firm withdrew from the project in 2023, leaving the study incomplete. If approved, BKF Engineers conducts a 2-year feasibility study to determine repair or replacement options, funded by sewer rates.

Auto-generated summary. Source: official agenda documents.

Votes

Approve consent calendar

Moved by: Mayor MartinezSeconded by: Vice Mayor Zepeda
Passed